As part of a comprehensive planning phase, we prepared design recommendations for the storm drainage improvements, as well as affected water, sanitary, and other utility relocations.

As part of a comprehensive planning phase, we prepared design recommendations for the storm drainage improvements, as well as affected water, sanitary, and other utility relocations.

We performed extensive hydrologic analysis and modeling of open and closed systems using HEC-1, Storm CAD, CAD, and GIS tools to establish existing conditions and design for recommendations for proposed improvements.

We performed extensive hydrologic analysis and modeling of open and closed systems using HEC-1, Storm CAD, CAD, and GIS tools to establish existing conditions and design for recommendations for proposed improvements.

Owner/Client
City of Charlotte
Location
Charlotte, North Carolina
Markets
Water
Acreage
700 acres
Completed
2012
Region
Southeast

As part of the Sunnyvale-Chandworth Storm Drainage Improvement project, we surveyed a 670+-acre watershed, including topographic mapping, cross section surveys, and inventory of existing utilities using aerial mapping. We met the city of Charlotte’s aggressive schedule by submitting all deliverables ahead of schedule, developing a strong relationship with the client in the process. Our storm drainage system study including analysis, design, cost-benefit analysis, and cost estimates provided the city with information needed to improve the existing and inadequate storm drainage system.