Suncoast Parkway 2, Section 2
Designing Over Challenging Barriers
- Client
- Florida Department of Transportation
- Location
- Hernando and Citrus Counties, Florida
- Markets
- Transportation
- Mileage
- 8 miles
- Cost
- $104 million
- Region
- Southeast
Twenty-six miles through Hernando and Citrus Counties, Florida, from U.S. 98 to U.S. 19 lies the Suncoast Parkway 2 project, a new alignment extension of Suncoast Parkway 1. Section 2 was eight miles and includes a number of challenging project barriers; varying topography, elevation changes, and a few miles of state-owned land.
To overcome those obstacles, we produced extremely detailed designs and right-of-way maps. We designed the project’s seven bridge locations and diamond interchange with unique vertical profiles to blend in with the 70-foot elevation changes along the corridor (normally unheard of in Florida). Our developed geometry kept with the existing flow of the terrain, and included pre-treating roadway runoff through the state-owned lands, thereby eliminating the need for off-site stormwater management ponds.
Bowyer-Singleton & Associates, Inc., acquired by Dewberry in 2013, performed this work.
8
mile stretch of land