Skip to Content

John J. Carroll Water Treatment Plant

Butterfly Valves for Water Emergencies

Transfer time between potable and raw water sources under our design is much shorter, while simultaneously maintaining a MA DEP-mandated separation between the two sources.

Transfer time between potable and raw water sources under our design is much shorter, while simultaneously maintaining a MA DEP-mandated separation between the two sources.

The John J. Carroll Water Treatment Plant, largest facility in New England, has a peak treatment capacity of 405 MGD and services over 2 million people.

The John J. Carroll Water Treatment Plant, largest facility in New England, has a peak treatment capacity of 405 MGD and services over 2 million people.

We prepared and reviewed several scenarios, ultimately recommending and designing installation of two butterfly valves in one chamber a short distance upstream of the plant.

We prepared and reviewed several scenarios, ultimately recommending and designing installation of two butterfly valves in one chamber a short distance upstream of the plant.

Owner/Client
Massachusetts Water Resources Authority
Location
Marlborough, Northborough, and Southborough, Massachusetts
Services
Engineering
Markets
Water
Completed
2010
Region
Northeast

At the request of the Massachusetts Water Resources Authority, in case of emergency shutdown of the primary water supply tunnel at the John J. Carroll Water Treatment Plant, we designed a solution for transferring water to a secondary supply tunnel. To replace the current time-consuming transfer procedure, we prepared and reviewed several scenarios, ultimately recommending and designing installation of two butterfly valves in one existing chamber a short distance upstream of the plant, saving the client more than $200,000 in construction costs compared to their preliminary design plan.

405 MGD

peak treatment capacity

2 million

people served by the plant

Related Projects