Grand Rapids Veterans Affairs Community-Based Outpatient Clinic

New Building Commissioning for a Leased Government Clinic

Our team identified barriers to implementing packaged rooftop control design.

Our team identified barriers to implementing packaged rooftop control design.

During construction, we reviewed equipment submittals, conducted construction site inspections, and worked with the construction team to perform startup and balancing.

During construction, we reviewed equipment submittals, conducted construction site inspections, and worked with the construction team to perform startup and balancing.

We developed functional test procedures for each system based on equipment performance requirements and sequence of operation.

We developed functional test procedures for each system based on equipment performance requirements and sequence of operation.

Owner/Client
U.S. Federal Properties
Location
Grand Rapids, Michigan
Services
Engineering
Square Footage
125,800 SF
Cost
$27 million
Completed
2015
Region
Midwest

We provided new building commissioning services for a 125,800-square-foot outpatient clinic in Grand Rapids, Michigan. The building is being developed by US Federal Properties, a private real estate developer, and will be leased to the Department of Veterans Affairs (VA) upon completion to provide specialty, mental health, radiology, audiology, dental, procedure, pharmaceutical, and primary care services.

We commissioned the mechanical, electrical, plumbing, and building automation control systems. Commissioned mechanical systems include rooftop air handling units with energy recovery, direct expansion cooling, gas heating and humidification, laboratory and general exhaust, a variable primary heating hot water system with condensing boilers, and building pressurization control. Commissioned plumbing systems include medical gas, domestic cold water, and domestic hot water. Commissioned electrical systems include normal and emergency power, automatic transfer switches, occupancy sensors, and network and daylighting controls. Design and construction was completed within two years, and we conducted a 10-month warranty review to identify system operation in peak summer conditions, finish deferred testing, and help resolve issues encountered since building occupancy.

125,800