Carter-Finley DAS Shelter Installation

Providing Cellular Coverage for a High-Density Sports Stadium

Construction services included cabling and pathway design from the existing neutral host DAS to the new shelter, and site/civil engineering for the site layout and foundation.

Construction services included cabling and pathway design from the existing neutral host DAS to the new shelter, and site/civil engineering for the site layout and foundation.

We coordinated with the local municipality and North Carolina State University on permitting requirements, and offered materials management and procurement.

We coordinated with the local municipality and North Carolina State University on permitting requirements, and offered materials management and procurement.

Additional construction services included concrete slab and ground ring installation; and backhaul and power, including trenching and boring.

Additional construction services included concrete slab and ground ring installation; and backhaul and power, including trenching and boring.

Location
Raleigh, North Carolina
Completed
2017
Region
Southeast

We provide design-build services for a neutral host distributed antenna system (DAS) installation site at North Carolina State University’s Carter-Finley Stadium. Our services included project management, engineering, permitting, and construction. These construction services included the installation of the base transceiver station (BTS), power cabinet, cabling to the radios, and integration. Due to a short construction timeline, we installed all equipment cabinets and cabling inside the shelter at an offsite location. The fully loaded 72,000-pound shelter was then transported to the project site, which allowed for a compressed schedule to meet the project deadline.

72,000

pound shelter