The proposed site will include a bus barn structure to house 118 CNG buses, a 10-bay maintenance and repair building, bus wash and steam cleaning facilities, CNG and diesel fueling stations, parking for 275 vehicles, and interior spaces.

The proposed site will include a bus barn structure to house 118 CNG buses, a 10-bay maintenance and repair building, bus wash and steam cleaning facilities, CNG and diesel fueling stations, parking for 275 vehicles, and interior spaces.

Site plan for a buffer park to redevelop the surrounding neighborhood with park, housing and retail. [credit: Holly D. Ben-Joseph Landscape Architect. Rendering by Brown, Richardson & Rowe]

Site plan for a buffer park to redevelop the surrounding neighborhood with park, housing and retail. [credit: Holly D. Ben-Joseph Landscape Architect. Rendering by Brown, Richardson & Rowe]

Owner/Client
Massachusetts Bay Transportation Authority
Location
Boston, Massachusetts
Markets
Transportation
Square Footage
340,000 SF
Cost
$225 million
Completed
2014
Region
Northeast

Our multidisciplinary team is designing a $225 million Compressed Natural Gas (CNG) and diesel fuel bus maintenance facility located adjacent to the “Arborway,” part of Boston’s historic Emerald Necklace chain of parks. The Massachusetts Bay Transportation Authority project started nearly two decades ago as a study on the site’s vacant portion. Over the years, we have worked closely with the agency, designing dozens of schemes for evaluation, including the current plan to situate the 340,000-square-foot facility to occupy as little land as possible, resulting in a compact, yet efficient, facility that enabled the MBTA to donate eight acres of land for a neighborhood park.

118