Queens Village Station Elevator Design

Bringing ADA Accessibility to the LIRR Queens Village Station

The eastbound tower was fabricated off-site, trucked to the project location, and installed in one day. Installation took place without disrupting the train schedule, impacting circulation, or encroaching on the existing station retaining wall.

The eastbound tower was fabricated off-site, trucked to the project location, and installed in one day. Installation took place without disrupting the train schedule, impacting circulation, or encroaching on the existing station retaining wall.

We managed the project from the initial design phase to final construction. Eastbound elevator tower and machine room conceptual sketch (left) and completed installation (right).

We managed the project from the initial design phase to final construction. Eastbound elevator tower and machine room conceptual sketch (left) and completed installation (right).

The westbound elevator and machine room were designed to fit in an unused space within the existing 90-year-old iconic station building.

The westbound elevator and machine room were designed to fit in an unused space within the existing 90-year-old iconic station building.

"This project will expand the vitality of the Queens Village business corridor and benefits of quality service that the LIRR provides to the 1,583 daily commuters that use this station." New York State Assemblywoman Barbara M. Clark

"This project will expand the vitality of the Queens Village business corridor and benefits of quality service that the LIRR provides to the 1,583 daily commuters that use this station." New York State Assemblywoman Barbara M. Clark

Owner/Client
MTA Long Island Rail Road
Location
Queens Village, New York
Services
Engineering
Markets
Transportation
Design Team
Urbahn Architects PLLC KS Engineering, P.C. AB Consulting Toscano Clements Taylor
Cost
$8.5 million
Completed
2013
Region
Northeast

As part of the LIRR’s overall strategy to improve access to their transit stations in southeast Queens, two new elevators were constructed at the Queens Village station. This upgrade makes it possible for riders with physical disabilities to obtain service to Manhattan and eastern Long Island that was previously inaccessible. In addition to modifying the station for ADA accessibility, a number of associated site, station, and platform improvements were made to reduce maintenance cost, improve station branding, and provide a better overall experience for customers. Some of these improvements included new railings, waiting room renovations, a shelter shed, tactile warning, security cameras, and new lighting.

Our services included overall design project management, structural, geotechnical, electrical, mechanical, plumbing, and fire protection engineering.

1,583

daily commuters

2

new elevators