Two floating composite accessory docks were constructed.

Two floating composite accessory docks were constructed.

The boat ramp was installed by removing a portion of an existing seawall.

The boat ramp was installed by removing a portion of an existing seawall.

The parking area consists of asphalt drive aisles, perimeter trailer parking spaces, and a semi-pervious grassed area with concrete tire strips for the interior trailer parking spaces.

The parking area consists of asphalt drive aisles, perimeter trailer parking spaces, and a semi-pervious grassed area with concrete tire strips for the interior trailer parking spaces.

The second phase of this project includes a new ship store facility and fuel station.

The second phase of this project includes a new ship store facility and fuel station.

Client
Wakulla County
Location
Wakulla County, Florida
Services
Engineering
Square Footage
3,765 SF
Cost
$735,000
Completed
September 2016
Region
Southeast

We designed and permitted a reinforced concrete boat ramp and floating dock system in a salt water environment for a public boating facility located on the Gulf of Mexico. We designed the boat ramp using push slab/cast-in-place methods and anchored the 1,600-square-foot floating dock system with treated timber piles and connected it to the ramp with aluminum gangplanks. Additionally, we performed construction engineering inspection services to deliver a quality finished product for the county.

Improvements also included the design of a new associated parking area, concrete sidewalks, stormwater management facility, landscaping, irrigation, lighting, fencing, gates, signage, striping, water, and sewer and electrical utilities. A future second phase was planned during the design and permitting of the project, which involves the construction of an elevated ship store building and fueling station. We are assisting the county in procuring grant funding to construct this future phase.

2

floating composite docks

30' x 110'

reinforced concrete boat ramp

Awards

  • 2017 Public Works Project of the Year, Transportation

    American Public Works Association