Organized for Efficiency

Through a three-day charrette, we worked with NAVFAC to build upon the strengths of existing facilities, developing an improved plan that complies with ACA accreditation requirements.

Through a three-day charrette, we worked with NAVFAC to build upon the strengths of existing facilities, developing an improved plan that complies with ACA accreditation requirements.

Each of the housing units is divided into two 40-bed pods that share centralized support functions. Each pod has direct access to the central activity quadrangle.

Each of the housing units is divided into two 40-bed pods that share centralized support functions. Each pod has direct access to the central activity quadrangle.

Our project team - including NAVFAC's project manager - was recognized by the Director of Navy Corrections for the excellence of the functional concept and RFP documents.

Our project team - including NAVFAC's project manager - was recognized by the Director of Navy Corrections for the excellence of the functional concept and RFP documents.

Client
Bureau of Naval Personnel
Owner
MIDLANT, Naval Facilities Engineering Command Chief of Naval Installations
Location
Chesapeake, Virginia
Markets
JusticeFederal
Certification
ACA Accreditation LEED® Silver
Square Footage
210,000 SF
Cost
$70 million
Region
Mid-Atlantic

Working with NAVFAC MidLANT and Navy Corrections, we developed the design-build RFP bridging documents for a new 400-bed correctional facility on a 25-acre site at the Naval Support Activity Norfolk Northwest Annex in Chesapeake, Virginia. The 210,000-SF, direct-supervision facility is organized around an activity quadrangle with five two-level housing units on one side and programs and services on the other. The plan separates staff, inmates, and public and service access requirements while optimizing efficiency. The design was developed to achieve LEED® Silver certification, with a green roof, gray water, geothermal, and daylighting technology.

400

bed correctional facility

Awards

  • 2009 Justice Facilities Review