I-64 Capacity Improvements – Segment 1
Widening a Heavily Used Interstate
- Client
- Shirley Contracting Company, LLC
- Owner
- Virginia Department of Transportation
- Location
- Newport News, Virginia
- Markets
- Transportation
- Cost
- $101.8 million
- Completed
- December 2017
- Region
- Mid-Atlantic
As part of the Shirley-Dewberry design-build team, we widened five miles of I-64 in Newport News from four to six lanes. Four existing bridges on I-64 were widened to accommodate the six-lane section (two over the Lee Hall Reservoir and two over Fort Eustis Boulevard), and the two existing bridges over Industrial Park Drive and CSX Railroad were demolished and replaced. Additional project elements included shoulder strengthening, approximately 12,500 linear feet of noise barriers, stormwater management facilities, drainage improvements, geotechnical ground improvements for soft and unsuitable soils, concrete pavement patching and repair, and asphalt pavement overlay.
12,500
linear feet of noise barriers
2
bridge replacements
4
bridges widened and repaired