I-64 Capacity Improvements – Segment 1

Widening a Heavily Used Interstate

We strengthened the outside shoulders between the Fort Eustis Boulevard Interchange and the eastern project limit to allow operation of a future fourth thru-lane in each direction.

We strengthened the outside shoulders between the Fort Eustis Boulevard Interchange and the eastern project limit to allow operation of a future fourth thru-lane in each direction.

Shoulder strengthening was incorporated by removal of the existing shoulder pavement and partial subbase removal, and replacement with a full-depth pavement section.

Shoulder strengthening was incorporated by removal of the existing shoulder pavement and partial subbase removal, and replacement with a full-depth pavement section.

Four existing bridges on I-64 were widened (two over the Lee Hall Reservoir and two over Fort Eustis Boulevard), and the two existing bridges over Industrial Park Drive and CSX Railroad were replaced.

Four existing bridges on I-64 were widened (two over the Lee Hall Reservoir and two over Fort Eustis Boulevard), and the two existing bridges over Industrial Park Drive and CSX Railroad were replaced.

As lead engineer, we were responsible for the completion of design field surveys, environmental permitting and documentation, and quality control during construction.

As lead engineer, we were responsible for the completion of design field surveys, environmental permitting and documentation, and quality control during construction.

Additional services included geotechnical investigations and recommendations, hydraulic and stormwater management design, and landscape design.

Additional services included geotechnical investigations and recommendations, hydraulic and stormwater management design, and landscape design.

Client
Shirley Contracting Company, LLC
Owner
Virginia Department of Transportation
Location
Newport News, Virginia
Markets
Transportation
Cost
$101.8 million
Completed
December 2017
Region
Mid-Atlantic

As part of the Shirley-Dewberry design-build team, we widened five miles of I-64 in Newport News from four to six lanes. Four existing bridges on I-64 were widened to accommodate the six-lane section (two over the Lee Hall Reservoir and two over Fort Eustis Boulevard), and the two existing bridges over Industrial Park Drive and CSX Railroad were demolished and replaced. Additional project elements included shoulder strengthening, approximately 12,500 linear feet of noise barriers, stormwater management facilities, drainage improvements, geotechnical ground improvements for soft and unsuitable soils, concrete pavement patching and repair, and asphalt pavement overlay.

12,500

linear feet of noise barriers

2

bridge replacements

4

bridges widened and repaired