Skip to Content

Department of Veterans Affairs Outpatient Clinic

Designing a LEED Silver Certified Clinic

The new VA Outpatient Clinic offers primary care for veterans throughout eastern North Carolina.

The new VA Outpatient Clinic offers primary care for veterans throughout eastern North Carolina.

The design earned the facility a LEED® Silver certification, partially due to the use of solar photovoltaics.

The design earned the facility a LEED® Silver certification, partially due to the use of solar photovoltaics.

For this fast-track design, we provided mechanical, electrical, plumbing, medical gas, fire protections, site/civil, and structural engineering services.

For this fast-track design, we provided mechanical, electrical, plumbing, medical gas, fire protections, site/civil, and structural engineering services.

Client
U.S. Department of Veterans Affairs
Location
Greenville, North Carolina
Services
Engineering
Certification
LEED® Silver
Square Footage
155,000 SF
Cost
$31 million
Completed
2014
Region
Southeast

The Department of Veterans Affairs (VA) Outpatient Clinic serves to provide primary care to veterans throughout eastern North Carolina. As a sub consultant to BBH Design and alongside Array Healthcare Facilities Solutions, we designed a 155,000-square-foot outpatient clinic, which houses numerous departments, including urgent care, oncology, various clinics, pharmacy, magnetic resonance imaging (MRI), audiology, and dental. For this fast-tracked design, we provided mechanical, electrical, plumbing, medical gas, fire protection, site/civil, and structural engineering services.

Our design provided utilities to the entire building by way of normal and emergency power as well as conditioning from a central utility plant, which houses chillers, boilers, and pumps. The building was designed in accordance with the VA’s Physical Security Design Manual standards for physical security, which include blast resistance of the exterior building’s facade and progressive collapse resistance using the tie-force method.

The design obtained a LEED® Silver certification due to the use of computer modeling, an enthalpy economizer, high-efficiency chillers, condensing boilers, lighting controls, T-5 fixtures, overhangs on windows, low velocity coils and ductwork, and solar photovoltaics.

155,000

square feet

Related Projects