Skip to Content

Arden Park

A Central Florida Multi-Phased Community

Our designs for Arden Park were completed in 2012 and construction is expected to be finished by 2020.

Our designs for Arden Park were completed in 2012 and construction is expected to be finished by 2020.

One of the many features of this single-family neighborhood is a walking trail around Lake Sims.

One of the many features of this single-family neighborhood is a walking trail around Lake Sims.

Our services included entitlements, civil engineering, site planning, and construction administration.

Our services included entitlements, civil engineering, site planning, and construction administration.

It was important that we design this community to naturally blend into the environment where it is located.

It was important that we design this community to naturally blend into the environment where it is located.

Phases 1 through 6 consist of a mix of 45-, 55-, 65-, and 75-foot lots, totaling 568 units.

Phases 1 through 6 consist of a mix of 45-, 55-, 65-, and 75-foot lots, totaling 568 units.

Client
CalAtlantic Homes
Location
Ocoee, Florida
Completed
2020
Region
Southeast

The single-family community of Arden Park is a multi-phased neighborhood consisting of 568 residential units, green open space tracts with community facilities, a walking trail, and an amenity center surrounding Lake Sims. The development is situated just north of Clarcona Ocoee Road and east of Ingram Road in Ocoee, Florida.

Our scope of services included entitlements, civil engineering, site planning, and construction administration. With a thorough design process and value engineering, we balanced the efficiency of the lotting plan with minimizing wall and drainage costs to create a community that is both cost effective and blends with the natural environment.

568

residential units

18,000

square-foot meeting hall and pool area

Related Projects