Route 295/42 Missing Moves, Bellmawr
An evaluation of the interchange network by the New Jersey Department of Transportation (NJDOT) identified several operational deficiencies, including the lack of direct connectivity between Route 295 and Route 42. As NJDOT's lead designer, our team designed ramps, each exceeding a half mile in length, to link the two roadways. The new ramps improve traffic flow, alleviate congestion on local roads, and reduce emissions and travel costs for daily commuters.
Related Insights
June 29, 2026
Environmental Scientist Phillip Bailey discusses bat acoustic surveys in about 90 seconds.
June 1, 2026
Dewberry to provide construction engineering inspection services at all sites.
April 6, 2026
Davis promoted to oversee growth and operations of firm’s progressive delivery operating unit.
Dimensions®
Our annual review and corporate social responsibility report, in one place.